Granny flat applications in Glen Innes Severn: CDC and DA statistics

3 secondary dwelling applications recorded in Glen Innes Severn Shire Council since 2025. 0% (0 of 3) used the CDC (complying development) pathway.

Quick answer

Glen Innes Severn has received 3 secondary dwelling applications since 2025. Under SEPP Housing 2021, secondary dwellings are permitted on lots of at least 450 m² in R1, R2, R3, and RU5 zones. Source: NSW Planning Portal open data as of 2026-06-14.

Headline statistics

The following data is sourced from the NSW Planning Portal open data API, generated on 2026-06-14. It covers all secondary dwelling Development Applications and Complying Development Certificates lodged in Glen Innes Severn Shire Council.

Total applications

3

Since 2025

CDC pathway

0%

0 of 3 applications

DA pathway

3 applications

3 decided

CDC median time

N/A

Submission to determination

DA median time

38 days

Lodgement to determination

Median build cost (CDC)

N/A

Self-reported at lodgement

Application volume is stable compared to 2025.

CDC vs DA pathway split

A Complying Development Certificate (CDC) is issued by a private certifier when a property meets all SEPP Housing 2021 standards. A Development Application (DA) goes through council assessment and is required when the property has constraints like heritage listing, flood overlay, or environmental sensitivity.

CDC vs DA pathway split

DA 100%
CDC: 0 issued certificatesDA: 3 applications (3 decided)

All CDC records in the NSW Planning Portal have status “Approved” — rejected CDC applications are not published in the open dataset. DA records show status “Determined” for all decided applications — the portal does not distinguish between approved and refused DAs.

Processing times and costs

CDC pathwayDA pathway
Median processing timeN/A38 days
Median development costN/A$155K
Average development costN/A$138K
Application count03

Cost of development is self-reported by applicants at lodgement and may not reflect actual construction costs. Processing time outliers (>365 days for CDCs, >730 days for DAs) are excluded from median calculations.

Year-by-year breakdown

Secondary dwelling application volumes in Glen Innes Severn by year, split by pathway. NSW Planning Portal reporting became mandatory for all councils from 1 July 2021, so earlier years may have incomplete data.

Applications by year

YearDAsCDCsTotal
2025202
2026101

SEPP Housing 2021 eligibility requirements

These state-wide standards apply to all secondary dwellings in NSW, including those in Glen Innes Severn. Meeting all standards qualifies a property for the CDC (complying development) pathway.

Minimum lot size

450 m²

Maximum floor area

60 m²

Permitted zones

R1, R2, R3, RU5

Rear setback

3 m (SEPP minimum)

Side setback

0.9 m (SEPP minimum)

Maximum height

8.5 m (2 storeys)

Properties with heritage listing, flood overlays, biodiversity values, or acid sulfate soil classifications are excluded from the CDC pathway and require a Development Application. See our full eligibility guide for details on each exclusion.

Frequently asked questions

How many granny flat applications has Glen Innes Severn received?

NSW Planning Portal records show 3 secondary dwelling applications in Glen Innes Severn Shire Council since 2025. Of these, 0 used the CDC (complying development) pathway and 3 were lodged as Development Applications.

What percentage of granny flat applications in Glen Innes Severn use the CDC pathway?

0% of secondary dwelling applications in Glen Innes Severn used the CDC pathway. CDCs are processed by private certifiers and are typically faster than council DAs.

How long does a granny flat CDC take in Glen Innes Severn?

Insufficient CDC data is available for Glen Innes Severn to report a reliable median processing time.

How much does a granny flat cost in Glen Innes Severn?

Insufficient cost data is available for Glen Innes Severn. Cost of development figures are self-reported by applicants at lodgement.

Can I build a granny flat in Glen Innes Severn?

Under SEPP Housing 2021, secondary dwellings are permitted in R1, R2, R3, and RU5 zones on lots of at least 450 m². The property must not be a heritage item, in a heritage conservation area, or affected by certain environmental overlays. Check your property at planning.nsw.gov.au.

Check if your Glen Innes Severn property qualifies

Enter an address to check lot size, zoning, heritage, flood, and environmental overlays against SEPP Housing 2021 requirements.

Run free eligibility check
This content is general information about NSW planning and property matters. It is not planning advice, legal advice, financial advice, or insurance advice, and should not be relied upon as a substitute for professional assessment. Planning controls and regulatory instruments change — verify current provisions at planning.nsw.gov.au and legislation.nsw.gov.au.